Saturday, May 30, 2009
Saturday mid-day update!
After a slow start, I got a small hole in the roof sealed, and part of the roof surveyed. The kids working with me have gotten about another 2/5ths of the floor up and will have the floor stripped hopefully by the end of the day. They also opened up the motor access panels in the floor for the first time in about forever.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment